带你了解济南卷帘门安装流程

来源:http://www.jnzxmy.com 日期:2025-07-14 发布人:

  济南卷帘门的安装需遵循规范流程,结合当地气候特点(如多风、多雨)确保结构稳固、运行顺畅,具体流程如下:

  The installation of rolling shutter doors in Jinan needs to follow standardized procedures, combined with local climate characteristics (such as windy and rainy) to ensure stable structure and smooth operation. The specific process is as follows:

  安装前的准备工作是基础。需根据门洞尺寸(宽度、高度)核对卷帘门的型号、规格,确保帘片长度、卷轴直径与门洞匹配,检查帘片、导轨、电机等部件是否完好,无变形、破损。清理门洞周边环境,移除杂物、障碍物,保证安装空间充足,尤其是顶部和两侧需预留足够位置安装卷轴、电机和导轨。测量门洞的垂直度和水平度,用卷尺检查左右两侧门洞高度差,若偏差超过 5mm,需用水泥砂浆找平,避免因门洞不平整导致卷帘门运行卡顿。同时准备好安装工具,如电钻、冲击钻、扳手、水平仪、卷尺等,以及膨胀螺栓、连接片等辅助材料,确保型号适配。

  The preparation work before installation is the foundation. Firstly, it is necessary to verify the model and specifications of the rolling shutter door based on the size of the door opening (width, height), ensuring that the length of the curtain and the diameter of the scroll match the door opening. Check whether the curtain, guide rail, motor and other components are intact, without deformation or damage. Clean up the surrounding environment of the door opening, remove debris and obstacles, ensure sufficient installation space, especially reserve enough space on the top and both sides to install scrolls, motors, and guide rails. Measure the verticality and levelness of the door opening, and use a tape measure to check the height difference between the left and right sides of the door opening. If the deviation exceeds 5mm, it needs to be leveled with cement mortar to avoid the roller shutter door running stuck due to uneven door opening. At the same time, prepare installation tools such as drills, impact drills, wrenches, level gauges, tape measures, as well as auxiliary materials such as expansion bolts and connecting pieces to ensure model compatibility.

  接下来进行导轨与支架安装。导轨需垂直固定在门洞两侧的墙体上,先用铅笔根据测量标记出导轨的安装位置,确保两侧导轨平行且与地面垂直,用水平仪校准后,用电钻在墙体上钻孔,植入膨胀螺栓,将导轨与墙体固定牢固,螺栓间距约 500mm,靠近上下两端的螺栓需加密,增强稳定性。对于钢结构门洞,可采用焊接方式固定导轨,焊接点需做防锈处理。随后安装卷轴支架,支架需固定在门洞顶部的墙体或横梁上,保证两个支架对称分布,中心间距与卷轴长度匹配,支架底部需用水平仪找平,确保卷轴安装后能水平转动,避免因倾斜导致帘片受力不均。

  Next, proceed with the installation of the guide rail and bracket. The guide rail needs to be vertically fixed on the walls on both sides of the door opening. First, use a pencil to mark the installation position of the guide rail according to the measurement, ensuring that both sides of the guide rail are parallel and perpendicular to the ground. After calibration with a level, use an electric drill to drill holes in the wall and implant expansion bolts to firmly fix the guide rail to the wall. The bolt spacing is about 500mm, and the bolts near the upper and lower ends need to be tightened to enhance stability. For steel structure door openings, welding can be used to fix the guide rails, and the welding points need to be treated with rust prevention. Subsequently, install the scroll bracket, which needs to be fixed on the wall or crossbeam at the top of the door opening to ensure symmetrical distribution of the two brackets, with the center distance matching the length of the scroll. The bottom of the bracket needs to be leveled with a level to ensure that the scroll can rotate horizontally after installation, avoiding uneven force on the curtain due to tilting.

20230627051144688

  卷轴与帘片组装是核心环节。将卷轴水平放置在支架上,用螺栓固定,卷轴两端需伸出支架一定长度,便于安装轴承和电机。安装轴承时确保与卷轴同心,转动灵活无卡滞。随后将帘片逐片连接,帘片之间的挂钩需扣合紧密,连接处涂抹少量润滑油,保证升降顺畅。将组装好的帘片与卷轴连接,固定时需确保帘片在卷轴上分布均匀,起始端需牢固固定,防止升降时打滑。对于带电机的卷帘门,需在卷轴一端安装电机,电机输出轴与卷轴通过联轴器连接,连接后手动转动卷轴,检查是否有异响或卡顿,确保传动顺畅。

  The assembly of scrolls and curtains is the core process. Place the scroll horizontally on the bracket and secure it with bolts. Both ends of the scroll should extend a certain length from the bracket to facilitate the installation of bearings and motors. When installing the bearing, ensure that it is concentric with the spool and rotates flexibly without any jamming. Then connect the curtain pieces piece by piece, and the hooks between the curtain pieces should be tightly fastened. Apply a small amount of lubricating oil to the connection to ensure smooth lifting. Connect the assembled curtains to the scroll, ensuring that the curtains are evenly distributed on the scroll during fixation. The starting end should be firmly fixed to prevent slipping during lifting. For roller shutter doors with motors, a motor needs to be installed at one end of the spool. The motor output shaft is connected to the spool through a coupling, and the spool is manually rotated after connection to check for any abnormal noise or jamming, ensuring smooth transmission.

  电机与控制系统安装需精准操作。根据电机型号连接电源线和控制线,电源线需选用符合功率要求的铜芯线,穿管保护后接入配电箱,控制线连接控制盒(如按钮开关、遥控接收器),确保接线正确,避免短路。安装控制盒时,需固定在便于操作的位置(如门洞侧方 1.5 米高度处),远离水源和潮湿环境。调试电机正反转,按下上升按钮,帘片应平稳上升;按下下降按钮,帘片应垂直下降,若方向相反需调换电源线相位。同时安装限位器,通过调整限位开关的位置,设定帘片上升到顶和下降到底的极限位置,防止过度运行导致电机过载或帘片损坏。

  The installation of motors and control systems requires precise operation. Connect the power cord and control cord according to the motor model. The power cord should be made of copper core wire that meets the power requirements. After being protected by conduit, it should be connected to the distribution box. The control cord should be connected to the control box (such as button switches and remote control receivers) to ensure correct wiring and avoid short circuits. When installing the control box, it should be fixed in a convenient position for operation (such as 1.5 meters high on the side of the door opening), away from water sources and humid environments. Debug the motor for forward and reverse rotation, press the up button, and the curtain should rise smoothly; Press the descent button, and the curtain should descend vertically. If the direction is opposite, switch the phase of the power cord. At the same time, install limiters and adjust the position of the limit switch to set the limit position for the curtain to rise to the top and fall to the bottom, in order to prevent motor overload or curtain damage caused by excessive operation.

  进行整体调试与固定。手动或电动操作卷帘门升降数次,观察帘片是否与导轨贴合紧密,无偏移、卡滞现象,若发现帘片与导轨摩擦,需微调导轨位置。检查各连接部位的紧固情况,尤其是卷轴支架、导轨固定螺栓,用扳手逐个加固,防止松动。对于底部的帘片,需安装防撞装置(如橡胶条),避免下降时撞击地面损坏帘片。清理安装现场的工具和废料,检查卷帘门的密封性,缝隙过大处可加装密封毛条,增强防风防雨性能。

  Finally, perform overall debugging and fixation. Manually or electrically operate the rolling shutter door up and down several times, observe whether the curtain is tightly attached to the guide rail without any deviation or jamming. If friction is found between the curtain and the guide rail, adjust the position of the guide rail slightly. Check the fastening of each connecting part, especially the fixing bolts of the scroll bracket and guide rail, and reinforce them one by one with a wrench to prevent loosening. For the bottom curtain, anti-collision devices (such as rubber strips) need to be installed to avoid damaging the curtain when it hits the ground during descent. Clean up the tools and waste materials at the installation site, check the sealing of the rolling shutter door, and install sealing strips in areas with large gaps to enhance wind and rain resistance.

  本文由济南卷帘门友情奉献.更多有关的知识请点击:http://www.jnzxmy.com真诚的态度.为您提供为的服务.更多有关的知识我们将会陆续向大家奉献.敬请期待.

  This article is a friendly contribution from Jinan Rolling Shutter Doors For more information, please click: http://www.jnzxmy.com Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

阅读/ Recommended reading

  济南卷帘门的安装需遵循规范流程,结合当地气候特点(如多风、多雨)确保结构稳固、运行顺畅,具体流程如下:  The installation of rolling shutter...

济南卷帘门 “罢工” 别慌!解锁应急处理全攻略 2025-07-03
卷帘门VS传统门锁:一场空间与的“隐形较量” 2025-06-16
耐用卷帘门挑选指南:从材质到结构的考量 2025-06-14
工厂适用的卷帘门有什么特殊性吗? 2025-06-12
仓库卷帘门该如何选择呢? 2025-05-27
济南卷帘门怎么做到防锈效果? 2025-05-14
济南卷帘门是怎么用心做产品的呢? 2025-05-09
浅析防火卷帘门应用时的注意事项 2025-05-07