建筑工程中防火卷帘门安装技术分析
防火卷帘门的安装施工技术
Installation and construction technology of fireproof rolling shutter doors
施工准备
Construction preparation
熟悉施工图纸和技术规范,了解防火卷帘门的安装要求和技术参数。
Familiar with construction drawings and technical specifications, understand the installation requirements and technical parameters of fireproof rolling shutter doors.
准备好施工所需的材料和设备,包括帘片、导轨、电机、控制箱等。
Prepare the materials and equipment required for construction, including curtains, guide rails, motors, control boxes, etc.
对施工现场进行清理和检查,确保施工条件符合要求。
Clean and inspect the construction site to ensure that the construction conditions meet the requirements.
测量放线
Measurement and laying out
根据施工图纸,在建筑结构上确定防火卷帘门的安装位置,并进行测量放线。
According to the construction drawings, determine the installation position of the fireproof rolling shutter door on the building structure and conduct measurement and layout.
确定导轨的安装位置和标高,保证导轨的垂直度和平整度。
Determine the installation position and elevation of the guide rail to ensure its verticality and flatness.
安装导轨
Install the guide rail
将导轨固定在建筑结构上,使用膨胀螺栓或焊接等方式进行固定。
Fix the guide rail to the building structure using expansion bolts or welding.
调整导轨的垂直度和平整度,确保帘片在升降过程中不会出现卡滞现象。
Adjust the verticality and flatness of the guide rail to ensure that the curtain does not get stuck during the lifting process.

安装卷轴
Install the scroll
将卷轴安装在卷帘箱内,调整卷轴的水平度和垂直度。
Install the scroll inside the rolling shutter box and adjust the levelness and verticality of the scroll.
安装传动装置,将电机与卷轴连接起来,确保传动装置的可靠性。
Install the transmission device and connect the motor to the reel to ensure the reliability of the transmission device.
安装帘片
Install the curtain panel
将帘片逐片安装在卷轴上,注意帘片的排列顺序和方向。
Install the curtain pieces piece by piece onto the scroll, paying attention to the arrangement order and direction of the curtain pieces.
调整帘片的间隙,保证帘片之间的密封性。
Adjust the gap between the curtains to ensure the sealing between them.
安装控制箱
Install control box
将控制箱安装在便于操作和维护的位置,连接好电源和控制线。
Install the control box in a location that is easy to operate and maintain, and connect the power and control wires.
对控制箱进行调试,确保其功能正常。
Debug the control box to ensure its proper functioning.
调试和验收
Debugging and acceptance
对防火卷帘门进行调试,检查其升降速度、限位开关、手动操作等功能是否正常。
Debug the fireproof rolling shutter door and check whether its lifting speed, limit switch, manual operation and other functions are normal.
进行防火性能测试,确保防火卷帘门在火灾发生时能够有效地阻止火势蔓延。
Conduct fire performance testing to ensure that fire-resistant rolling shutter doors can effectively prevent the spread of fire in the event of a fire.
组织相关部门进行验收,验收合格后,方可投入使用。
Organize relevant departments to conduct acceptance, and only after passing the acceptance can it be put into use.
本文由 济南卷帘门厂 友情奉献.更多有关的知识请点击 http://www.jnzxmy.com 真诚的态度.为您提供为的服务.更多有关的知识我们将会陆续向大家奉献.敬请期待.
This article is a friendly contribution from Jinan Rolling Shutter Door Factory For more related knowledge, please click http://www.jnzxmy.com Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.
阅读/ Recommended reading
- 济南卷帘门选对款!奥式卷帘门,便捷还省心 2026-01-28
- 济南电动卷闸门惊险掉落?配件尺寸偏差是隐形杀手 2026-01-23
- 济南卷帘门使用避坑!这个操作误区千万别犯 2026-01-20
- 济南卷帘门为啥贵?源头工厂直供才是省钱关键 2026-01-14
- 济南卷帘门选购,认准诚信商家才不花冤枉钱 2026-01-11
- 济南卷帘门选购避坑指南!源头厂家教你选对不花冤枉钱 2026-01-05
- 济南卷帘门选购指南:种类全解析+选型技巧,选对不踩坑! 2025-12-25
- 济南卷帘门维修攻略:电机控箱更换+故障排查,实用到爆! 2025-12-22
济南卷帘门种类多!哪种适合你?一文读懂不踩坑 There are many types of rolling shutter doors in Jinan! Which on...